Application of Vertiv technology in the power industry


Published:

2024-08-21

1.Pakistan Combined Cycle Power Plant Project

Project Requirements

  • BHIKKI (1180MW) power plant, 2+2+1 configuration (9HA gas turbine, waste heat boiler, steam turbine generator)
  • BALLOKI (1223MW) power plant, 2+2+1 structure
  • The first H-class combined cycle power plant in Asia, requiring internationally renowned brands, rich application cases, and full American standard design

Solutions and Value

  • Power UPS system + DC power supply system + battery
  • Reliable quality and rich product solutions help the implementation of the "Belt and Road" landmark project

 

2.State Grid Hunan Baiguan 220kV Smart Energy Station Multi-station Integration Project

Project Requirements

  • A T3 data center will be built at Chengjia 220kV Smart Energy Station, using a modular data center construction method. Three micro-modules will be built in the current phase and 10 micro-modules will be built in the final phase.
  • Each IT micromodule has 19 IT equipment cabinets (one of which is used as a network aggregation cabinet), with a power density of 10kW/cabinet
  • Communication access micromodule IT equipment cabinets 10, power density 3kW/cabinet

Solutions and Value

  • Powered by high voltage DC plus mains
  • Provide complete data center solutions, including: 2 and a half sets of SmartAisle™2+EPK+HVDC+CRV4S+
  • PEH+ monitoring system
  • Customized on demand, customers innovatively adopt DC power supply solutions to utilize photovoltaic and energy storage systems in substation construction

Quick contact

Leave contact information and get free product quotation.

Submit
%{tishi_zhanwei}%