1.Pakistan Combined Cycle Power Plant Project
Project Requirements
- BHIKKI (1180MW) power plant, 2+2+1 configuration (9HA gas turbine, waste heat boiler, steam turbine generator)
- BALLOKI (1223MW) power plant, 2+2+1 structure
- The first H-class combined cycle power plant in Asia, requiring internationally renowned brands, rich application cases, and full American standard design
Solutions and Value
- Power UPS system + DC power supply system + battery
- Reliable quality and rich product solutions help the implementation of the "Belt and Road" landmark project

2.State Grid Hunan Baiguan 220kV Smart Energy Station Multi-station Integration Project
Project Requirements
- A T3 data center will be built at Chengjia 220kV Smart Energy Station, using a modular data center construction method. Three micro-modules will be built in the current phase and 10 micro-modules will be built in the final phase.
- Each IT micromodule has 19 IT equipment cabinets (one of which is used as a network aggregation cabinet), with a power density of 10kW/cabinet
- Communication access micromodule IT equipment cabinets 10, power density 3kW/cabinet
Solutions and Value
- Powered by high voltage DC plus mains
- Provide complete data center solutions, including: 2 and a half sets of SmartAisle™2+EPK+HVDC+CRV4S+
- PEH+ monitoring system
- Customized on demand, customers innovatively adopt DC power supply solutions to utilize photovoltaic and energy storage systems in substation construction